Jurnal manajemen risiko pada proyek konstruksi

broken image
broken image

The possible consequence of such hazards is that the employees may experience light to serious injuries and even fatality. These hazards were caused by 5 factors, i.e., human, machine/equipment, method, material, and environment.

broken image

Results: As many as 9 hazards were found in the tank sinking procedure in the construction of a Shell Gasoline Station in Surabaya. Data collection was executed using primary data derived from interviews and field observation as well as secondary data in the forms of supporting documents from the company. The subjects of the study were the employees of PT Usaha Jaya Engineering who worked on the Tank Sinking procedure in the construction of a Shell Gasoline Station in Surabaya with the minimum service period of 2 years and with a total number of 7 people. Methods: This is a qualitative descriptive study with case study design. This study is aimed at finding the OSH risk management of the tank sinking procedure using Bow Tie Analysis method in the construction of a Shell Gasoline Station in Surabaya. Such a situation has led to the need for risk management in the area of Occupational Safety and Health (OSH). Introduction: The rate of work accidents in the construction sector is still high.

broken image

Keyword_1 Bow Tie Analysis Keyword_2 Manajemen Risiko K3 Keyword_3 Tank Sinking Abstract Fakultas Kesehatan Masyarakat, Universitas Ahmad Dahlan

broken image